Shipbucket http://shipbucket.com/forums/ |
|
Norway Project 6615 new Coast guard vessel http://shipbucket.com/forums/viewtopic.php?f=13&t=5960 |
Page 2 of 5 |
Author: | Tempest [ March 30th, 2015, 10:32 am ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
Great drawing heuhen. |
Author: | heuhen [ January 13th, 2017, 6:18 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
Since Colo love opening old post... Have updated the drawing, after the latest 3D pictures that have come out, with soma small changes. It have been decided to build 3 vessel of this class, instead of a to various class. 6 shipyards have been qualified for the contract, they have to send in their "suggestion and price" early this year, the shipyards are: Westcon Yards AS Fitjar Mekaniske Verksted AS Havyard Ship Technology AS Ulstein Verft AS Kleven Maritime AS Vard Langsten AS My favorite is "Kleven Maritime AS" and "Havyard Ship Technology AS", due to their know how, but "Ulstein" are also a big one. The timeplan for the project is: Negotiations with shipyards (2017) Parliamentary negotiations (spring 2018) Contract award (2018) Detailed Design (2018 - 2019) Construction (2019 - 2024) Test (Autumn 2021) Delivery first vessel (2022) SPECIFICATION NEW coastguard vessels: Length: 136.4 meters Width: 19 meters Draught: 6.2 meters Displacement: 9,800 tons Steel Weight: 4,500 tons Speed: Minimum 22 knots Seaworthiness: Safe to perform operations, inclusive seastate 5 Ice Class: ICE-1A * F (Extreme ice conditions, 1 meter of ice, can to some extent work without help of an icebreaker) Winterization: Winterized Polar (-30) Progress: Diesel Electric Endurance: 8 weeks without supply Berth Capacity: 100 people Container Capacity on deck Hangar Space: 2 x NH 90 Helideck: Can take down AW 101-size Two rescue boats There's a lot of talks in media from "so called experts", that are criticizing the project for not using the Norwegian Engineer power and know how and design something totally new for the future, they are saying that the project is purposely avoiding new technology.... After my understanding they are doing it this way, because the Navy only want proven technology, that are ready for action tomorrow, not in 10-14 years! |
Author: | Hood [ January 14th, 2017, 11:54 am ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
Looks a big ship for a coast guard vessel, very impressive. Whatever the critics say its probably better than some other nations could manage at the moment (I'm thinking the UK!). |
Author: | Krakatoa [ January 14th, 2017, 6:10 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
There really is only one criteria - will it do the job it is to be built for? If answer is 'yes' then there is no problem. Other roles will be found for them after they are built. Having only 'proven' technology aboard is a good thing - the ship will be cheaper and easier to service. |
Author: | Morten812 [ January 14th, 2017, 6:14 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
It odd the boats aren't behind doors the rough enviroment the ships will operate in taken into account. |
Author: | heuhen [ January 14th, 2017, 6:25 pm ] | |
Post subject: | Re: Norway Project 6615 new Coast guard vessel | |
It odd the boats aren't behind doors the rough enviroment the ships will operate in taken into account.
I presume the big one will be behind the door, but not the small one, mostly due to placement.
|
Author: | rundrewrun99 [ January 22nd, 2017, 4:18 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
I never understood what this one part was. Is it... nvm I will just show you and hope you know |
Author: | JSB [ January 22nd, 2017, 4:54 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
Fire hose? |
Author: | heuhen [ January 22nd, 2017, 4:57 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
yes, come from the old parts sheets. |
Author: | reytuerto [ January 22nd, 2017, 10:36 pm ] |
Post subject: | Re: Norway Project 6615 new Coast guard vessel |
Hi Heuhen, good afternoon. May I ask the reason of the 5 (or more?) fire hoses in the OPV? Are they planed as a deterret (as a non lethal «weapon») for piracy off Somalia / Gulf of Aden area? Thanks and cheers. |
Page 2 of 5 | All times are UTC |
Powered by phpBB® Forum Software © phpBB Limited https://www.phpbb.com/ |